How much concrete for a 10×12 shed?

Short answer

Order 1.63 cubic yards for a 10 × 12 ft shed slab 4 inches thick: 1.48 cubic yards in the forms plus 10% extra. That is about 74 bags of 80 lb mix. With a thickened edge, plan on about 2 cubic yards.

How to work it out

  1. 12 ft × 10 ft = 120 sq ft
  2. 120 sq ft × 4 in ÷ 12 = 40 cu ft ÷ 27 = 1.48 cu yd
  3. + 10% extra = 1.63 cu yd = 44 cu ft
  4. 44 cu ft ÷ 0.6 cu ft per 80 lb bag = 74 bags

A 10×12 is the most popular backyard shed size, and a concrete floor gives it a base that won’t rot or shift. The slab itself is modest; what changes the order is whether the edges are thickened.

Adjust for your project

ft
ft
in
2×4 forms give 3½ in. Driveways and structural slabs: per your plans
Only this choice is added to your project’s Total to buy
Yield is printed on the bag; lb sizes are Quikrete figures, kg sizes Sakrete
More options: Extra · Price
%
5–10% for a slab on a level, compacted base · more if the ground is uneven
$
Optional — an example figure; use your store’s price
Concrete to order1.63 cu yd44 cu ft
Or bags of mix (incl. extra)
74 bags · 80 lb bag
Concrete before the extra
1.48 cu yd (40 cu ft)
Slab area
120 sq ft
Weight of the concrete (≈ 145 lb/cu ft)
5,800 lb (3 tons)
  • 74 bags is a lot of mixing. Compare a ready-mix delivery (ask about minimum loads and short-load fees) with the bags vs ready-mix calculator.
  • Total to buy counts this as ready-mix. Switch “How will you buy it?” to bags if you are mixing it yourself.
  • Plan control joints about 1 in deep every 6–8 ft (Quikrete’s guidance) so shrinkage cracks follow your lines.
Quantity onlyFooting size and depth, reinforcement and slab thickness for structures are set by your local code — check with your building department.

For this job · affiliate link
Portable electric concrete mixer74 bags by hand is a long, heavy day. A drum mixer handles two or three 80 lb bags a batch, so the slab goes in before the first batch stiffens.
View on Amazon (opens in a new tab)

10×12 shed slab by thickness (10% extra included)

10×12 shed slab by thickness (10% extra included)
ThicknessConcrete to orderOr bags of mix (incl. extra)Weight of the concrete (≈ 145 lb/cu ft)
3.5 in1.43 cu yd65 bags5,075 lb
4 in1.63 cu yd74 bags5,800 lb
5 in2.04 cu yd92 bags7,250 lb
6 in2.44 cu yd110 bags8,700 lb

Flat slab vs thickened edge

A plain 4 in slab for a 10 × 12 shed is 1.48 yards, 1.63 with the extra. Many shed slabs are poured with the edge turned down — deeper around the perimeter so the walls sit on more concrete. Whether yours needs one, and how deep, depends on the shed, your soil and your local rules, so check with your building department; some areas treat larger sheds as structures with foundation requirements.

If you do thicken the edge, add it separately: the perimeter of a 10 × 12 is 44 ft. An edge 8 in wide and 4 in deeper than the slab adds 44 × 0.67 × 0.33 = 9.8 cu ft, about 0.36 yards, or 17 more of the 80 lb bags. The footing volume calculator handles that with your real dimensions.

Bags or truck for a shed floor

Seventy-four bags is a long day even with a mixer, and the slab has to be placed in one go. With a thickened edge the total is about 2 yards (1.63 + 0.36), so many people order 2 yards of ready-mix for a shed this size. Set anchor bolts or straps into the wet concrete if the shed is to be fastened down; mark their positions on the forms first. For reinforcement, many shed slabs get welded wire mesh or a fiber mix — check the shed maker’s foundation guide and your building department; the steel itself is counted on how much wire mesh for a slab. The base under the slab is worked through on how much gravel under a concrete slab, and a smaller shed pad on how many bags of concrete for an 8×8 slab. If you would rather sit the shed on a low block wall, see how many cinder blocks for a 10×10 shed.

What you’ll need

As an Amazon Associate we earn from qualifying purchases. Links to products are affiliate links — they cost you nothing extra and help keep these calculators free.

Frequently asked questions

How much concrete for a 10×12 shed slab 6 inches thick?

2.22 cubic yards before extra, 2.44 cubic yards with 10%.

How much concrete for an 8×10 shed base?

1.09 cubic yards at 4 inches with 10% extra, or 49 bags of 80 lb.

How much concrete for a 10×10 shed?

1.36 cubic yards with 10% extra at 4 inches (62 bags of 80 lb), before any thickened edge.