Ready-mix vs bagged concrete calculator

Enter how much concrete the job needs to see what a ready-mix order looks like next to the same pour in bags.

Enter your measurements

cu yd
The “before the extra” figure from the slab, footing or steps calculator — the extra is added below
Only this choice is added to your project’s Total to buy
Yield is printed on the bag; lb sizes are Quikrete figures, kg sizes Sakrete
More options: Extra · Bag $ · Ready $ …
%
Same 10% the slab calculator uses. NRMCA suggests 4–10% over the plan volume
$
Optional — an example figure; use your store’s price
$per cu yd
Optional — ask your local plant; prices vary by region and mix
Optional — many plants add a fee on small orders; ask what theirs is
cu yd
NRMCA: truck mixers carry 8 to 12 cu yd (about 6 to 9 m³). Ask your plant
Ready-mix to order2.25 cu yd60.8 cu ft
Truckloads
1 truck
Or bags of mix (same volume)
99 bags · 80 lb bag
Weight of those bags
7,920 lb (4 tons)
Weight of the delivered concrete
8,809 lb (4 tons)
Mixer batches at 2 bags each
50 batches
How we got this

2 cu yd + 10% = 2.2 cu yd → round up to the next ¼: 2.25 cu yd

2.25 cu yd ÷ 10 cu yd per truck = 1 truck

Same job in bags: 59.4 cu ft ÷ 0.6 cu ft per 80 lb bag = 99 bags (7,920 lb)

  • 99 bags means lifting about 7,920 lb of dry mix. Unless the truck can’t reach, ready-mix is usually far less work and gives a more even slab.
  • Total to buy counts this as ready-mix. Switch “How will you buy it?” to bags if you are mixing it yourself.
  • Ask the plant about its minimum order, any short-load fee, how long the driver can wait, and whether the truck can reach your forms — a pump or buggy costs extra.

For this job · affiliate link
Bull float with handleWith a truck on the way, have the screed, bull float and enough helpers ready before it arrives — the driver’s waiting time is limited.
View on Amazon (opens in a new tab)

Next: work out the volume of your slab · how to pour a slab

Quick answers for common sizes

Worked examples for the Ready-Mix vs Bags Calculator
ExampleAnswer
How much concrete does a truck hold8 to 12 cubic yards (about 6 to 9 m³)

Bags vs truck at other volumes

Bags vs truck at other volumes
Concrete needed (before extra)Ready-mix to orderOr bags of mix (same volume)Weight of those bagsTruckloads
0.5 cu yd0.75 cu yd25 bags2,000 lb1 truck
1 cu yd1.25 cu yd50 bags4,000 lb1 truck
2 cu yd2.25 cu yd99 bags7,920 lb1 truck
3 cu yd3.5 cu yd149 bags11,920 lb1 truck
5 cu yd5.5 cu yd248 bags19,840 lb1 truck
10 cu yd11 cu yd495 bags39,600 lb2 trucks

Every concrete job starts with the same question: bags or a truck? Bags win for small pours, places a truck can’t reach and jobs spread over days. A ready-mix truck wins on effort and on consistency as soon as the bag count climbs — one cubic yard is 45 bags of 80 lb, about 3,600 lb to lift, open and mix.

What a ready-mix truck holds

NRMCA’s guide to ordering ready-mixed concrete puts the capacity of truck mixers at 8 to 12 cubic yards (about 6 to 9 m³), and a loaded truck weighs about 80,000 lb. That weight is why the driver may refuse to cross a lawn, a septic field or a thin driveway — plan a route on firm ground, or budget for a pump or a power buggy. See how much concrete a truck holds for the numbers in bags and tons.

How to decide

Bag counts at Quikrete’s 0.60 cu ft per 80 lb bag. Where the line falls depends on local prices, fees and how many helpers you have.
Job sizeBags (80 lb)Usually
Under ½ yd (posts, a small pad, steps)up to 23Bags — mix in a tub or small mixer
½–1 yd23–45Either. Bags with a rented mixer, or a small-load delivery if available
1–2 yd45–90Price both; ask about short-load fees
Over 2 yd90+Ready-mix, unless the site is truly unreachable

Ordering tips

  • Order a little extra. NRMCA suggests 4–10% more than the volume from the plan dimensions, to cover spillage, form bulge and an uneven base. Running short is far more expensive than a few wheelbarrows left over.
  • Ask about minimums and fees. Many plants charge extra on small loads or on time the truck waits past an allowance. Get the numbers when you book.
  • Tell them the job. The plant will suggest a mix (strength, slump, air for freeze-thaw) for a patio, footing or driveway. NRMCA notes slumps of 3 to 5 in suit most applications.
  • Be ready before the truck arrives. Forms checked, base damp but without puddles, tools and helpers on site. NRMCA notes concrete normally sets and hardens within two to eight hours after mixing, sooner on a hot day.

If you go with bags

Quikrete says to allow at least 1 cu ft of mixer capacity per 80 lb bag mixed at once, so a small electric mixer handles one or two bags at a time and a towable rental three or more. Line the bags up beside the mixer, keep a hose with a shut-off nozzle handy, and work continuously so each batch joins the last before it stiffens. The bag yield chart lists bags per yard for every size.

CautionHand-mixing a yard of bags is hard on your back. NIOSH treats 51 lb as the most nearly all healthy workers should lift even in ideal conditions, and an 80 lb bag is well over that. Get help, use a cart, and consider 60 or 50 lb bags if you are working alone.

What you’ll need

As an Amazon Associate we earn from qualifying purchases. Links to products are affiliate links — they cost you nothing extra and help keep these calculators free.

Frequently asked questions

What is a short load of concrete?

A ready-mix order smaller than the plant’s standard minimum. Many plants still deliver it but add a short-load fee; the threshold and fee vary, so ask when you call. The calculator has an optional field for the fee so you can compare honestly.

Is it cheaper to buy bags or ready-mix?

It depends on local prices. Enter your bag price and the plant’s price per yard (plus any fee) and the calculator compares them. Even when bags cost about the same, ready-mix usually saves a day of labor on anything over a yard or so.

How many bags of concrete equal a yard of ready-mix?

About 45 bags of 80 lb, 60 of 60 lb or 90 of 40 lb, using Quikrete’s data-sheet yields. See how many 80 lb bags of concrete in a yard.

How far will a ready-mix truck chute reach?

Not far — chutes extend several feet from the back of the truck. Beyond that you need wheelbarrows, a power buggy or a pump truck. Ask the plant what its chutes reach and plan the truck’s parking spot before you book.