How much concrete does a truck hold?
A ready-mix truck holds 8 to 12 cubic yards of concrete (about 6 to 9 cubic metres), according to NRMCA. A 10-yard load is the same as 450 bags of 80 lb concrete mix and weighs about 39,150 pounds.
How to work it out
- 10 cu yd + 0% = 10 cu yd → round up to the next ¼: 10 cu yd
- 10 cu yd ÷ 10 cu yd per truck = 1 truck
- Same job in bags: 270 cu ft ÷ 0.6 cu ft per 80 lb bag = 450 bags (36,000 lb)
The drum size varies by truck, and so does what it can legally carry: weight limits on local roads often keep a truck from leaving the plant completely full. That is why the plant, not the truck’s size, decides how many loads your pour needs.
Adjust for your project
More options: Extra · Bag $ · Ready $ …
- Truckloads
- 1 truck
- Or bags of mix (same volume)
- 450 bags · 80 lb bag
- Weight of those bags
- 36,000 lb (18 tons)
- Weight of the delivered concrete
- 39,150 lb (20 tons)
- Mixer batches at 2 bags each
- 225 batches
- 450 bags means lifting about 36,000 lb of dry mix. Unless the truck can’t reach, ready-mix is usually far less work and gives a more even slab.
- Total to buy counts this as ready-mix. Switch “How will you buy it?” to bags if you are mixing it yourself.
- Ask the plant about its minimum order, any short-load fee, how long the driver can wait, and whether the truck can reach your forms — a pump or buggy costs extra.
Truckloads and bag equivalents by order size
| Concrete needed (before extra) | Truckloads | Or bags of mix (same volume) | Weight of the delivered concrete |
|---|---|---|---|
| 2 cu yd | 1 truck | 90 bags | 7,830 lb |
| 5 cu yd | 1 truck | 225 bags | 19,575 lb |
| 8 cu yd | 1 truck | 360 bags | 31,320 lb |
| 10 cu yd | 1 truck | 450 bags | 39,150 lb |
| 12 cu yd | 2 trucks | 540 bags | 46,980 lb |
| 20 cu yd | 2 trucks | 900 bags | 78,300 lb |
A truckload in other units
| Load | Cubic feet | m³ | 80 lb bags | Concrete weight (≈145 lb/cu ft) |
|---|---|---|---|---|
| 8 yd | 216 | 6.1 | 360 | ≈ 31,300 lb (15.7 tons) |
| 10 yd | 270 | 7.6 | 450 | ≈ 39,150 lb (19.6 tons) |
| 12 yd | 324 | 9.2 | 540 | ≈ 47,000 lb (23.5 tons) |
Add the truck itself and NRMCA puts a loaded mixer at about 80,000 lb. Keep that in mind before you ask the driver to back across a lawn, over a septic tank or onto a thin driveway apron.
Planning loads for your pour
Divide your order by the capacity your plant quotes and round up. A 24 × 24 ft garage floor at 4 in with 10% extra is about 7.8 yards — one truck — while a 30 × 40 shop floor needs two or more; both are worked through on how many yards of concrete for a 24×24 slab and how much concrete for a 30×40 slab. For more than one truck, ask for spacing that matches how fast your crew can place and finish.
At the small end, a truck carrying a yard or two is still a full trip for the plant, which is why small orders often carry a fee. For those, compare bags — how many 80 lb bags of concrete in a yard shows what a single yard means in bags.
Different size? Use the full Ready-Mix vs Bags Calculator.
What you’ll need
- Bull float with handleMid-range price
Smooths and levels a slab you can’t reach across, right after screeding. Rent or buy one for anything wider than about 6 ft.
See options on Amazon (opens in a new tab) - Aluminum screedMid-range price
A straight, light screed strikes off the concrete level with the forms. A straight 2×4 works too if it really is straight.
See options on Amazon (opens in a new tab) - Rubber work bootsMid-range price
For standing in wet concrete. Tuck trousers in or tape them so concrete can’t run down inside the boot.
See options on Amazon (opens in a new tab)
As an Amazon Associate we earn from qualifying purchases. Links to products are affiliate links — they cost you nothing extra and help keep these calculators free.
Frequently asked questions
How many bags of concrete equal a 12-yard truck?
540 bags of 80 lb, weighing 43,200 pounds dry.
How many tons of concrete does an 8-yard truck carry?
About 31,320 pounds of concrete, roughly 15.7 tons at 145 lb per cubic foot.
How many trucks for 20 yards of concrete?
2 trucks of 10 yards each. Ask your plant what its trucks carry.
Sources
- NRMCA Concrete in Practice 31 — Ordering Ready Mixed Concrete (opens in a new tab) — Truck mixers carry 8 to 12 cubic yards (about 6 to 9 m³); order 4–10% more than the plan estimate; a loaded truck weighs about 80,000 lb; fresh concrete can cause severe chemical burns.
- Quikrete Concrete Mix (No. 1101) data sheet (opens in a new tab) — Yields: 40 lb ≈ 0.30, 50 lb ≈ 0.375, 60 lb ≈ 0.45, 80 lb ≈ 0.60, 90 lb ≈ 0.675 cu ft; unit weight ≈ 140 lb/cu ft; for pours 2 in thick or more; 6–9 pints of water per 80 lb bag; control joints every 6–8 ft; cure 5 days at 70 °F or above, 7 days at 50–70 °F; protect from freezing for 48 hours.
- Iowa DOT Instructional Memorandum 340 — Weight per cubic foot, yield and air content of concrete (opens in a new tab) — Normal-weight concrete is typically 140–150 lb per cu ft at 5 to 8 percent air.
- NIOSH Applications Manual for the Revised NIOSH Lifting Equation (Pub. 94-110) (opens in a new tab) — Load constant of 51 lb (23 kg) — the most nearly all healthy workers should lift under ideal conditions; real lifts allow less.