Gravel base calculator for under a concrete slab

Enter the slab size, the base depth from your plans and the stone to see how many tons to order for a compacted base.

Enter your measurements

ft
ft
in
Use the depth your plans or local practice call for
in
On each side. Some builders run the base a few inches past the forms
More options: Waste
%
Stone to order2.46 tons4,925.93 lb
Compacted volume in place
1.23 cu yd (33.3 cu ft)
Loose volume (as delivered)
1.62 cu yd
Base area
100 sq ft
How we got this

10 ft × 10 ft = 100 sq ft × 4 in = 1.23 cu yd compacted

× 1.9 tons per compacted cu yd + 5% = 2.46 tons

Loose, as delivered: 2.46 tons ÷ 1.52 tons/cu yd = 1.62 cu yd

  • Compact in layers of a few inches with a plate compactor, dampening crusher run so it packs. A soft or wet subgrade under the stone needs fixing first — gravel won’t bridge it.

For this job · affiliate link
Hand tamperA hand tamper handles edges and corners and small pads; for a full slab base, rent a plate compactor for the main area.
View on Amazon (opens in a new tab)

Next: the concrete for the slab · mesh or rebar

Quick answers for common sizes

Worked examples for the Gravel Base Under Slab Calculator
ExampleAnswer
How much gravel under a concrete slabAbout 2.98 tons of crusher run, 4 in compacted, for a 10×10 slab

Your base at other depths

Your base at other depths
Base depth (compacted)Stone to orderCompacted volume in placeLoose volume (as delivered)
2 in1.23 tons0.62 cu yd0.81 cu yd
3 in1.85 tons0.93 cu yd1.22 cu yd
4 in2.46 tons1.23 cu yd1.62 cu yd
6 in3.69 tons1.85 cu yd2.43 cu yd
8 in4.93 tons2.47 cu yd3.24 cu yd

Most slabs on grade sit on a layer of compacted stone. It gives the concrete a firm, even bed, lets water drain away underneath, and makes it easier to get a slab of consistent thickness. How deep it should be depends on your soil, climate and plans; once you know, the stone is a volume and weight calculation.

How the base is calculated

compacted cu yd = (length + 2 × overhang) × (width + 2 × overhang) × depth (in) ÷ 12 ÷ 27
tons = compacted cu yd × tons per compacted yard × (1 + waste)
loose cu yd = tons ÷ loose tons per yard
Crusher run packs down a lot because its fines fill the gaps; clean #57 stone packs very little. Moisture and the quarry change these figures — your supplier’s number is best.
MaterialTons per compacted cu ydTons per loose cu ydSource
Crusher run / dense-graded base≈ 1.9 (1.75–2.1)≈ 1.5WisDOT conversion factors
#57 stone (vibrated / loose)≈ 1.47≈ 1.29FHWA-HRT-15-034 unit weights

Crusher run (also sold as DGA, road base or 21A depending on region) compacts into a hard, flat bed and is the usual choice under patios and sheds. Clean #57 stone drains better and is often used where water is a concern; it doesn’t pack as tight, so screed it carefully. The worked example is on how much gravel under a concrete slab.

Tips

  • Strip sod and topsoil first — organic soil under a slab keeps settling.
  • Compact in lifts of a few inches; a single thick layer packs only at the top.
  • Set the top of the compacted base exactly one slab-thickness below the top of the forms. A base that is half an inch high anywhere makes a thin spot in the slab.
  • Indoors and under heated buildings, plans often call for a vapor barrier or insulation over the base — follow them.

What you’ll need

As an Amazon Associate we earn from qualifying purchases. Links to products are affiliate links — they cost you nothing extra and help keep these calculators free.

Frequently asked questions

How much gravel do I need under a 12×12 slab?

At 4 in compacted, a 12 × 12 ft base is 1.78 cubic yards in place — about 3.5 tons of crusher run with 5% extra. Enter your own depth above.

Should I use crusher run or #57 stone under concrete?

Crusher run packs into a firm, flat bed and is the usual base for patios and sheds. Clean #57 drains better but doesn’t lock together as tightly. Follow your plans or ask your supplier what is used locally.

Why order more tons than the compacted volume suggests?

Loose stone takes up more room in the truck than it does once packed. Crusher run can lose 20–30% of its loose volume when compacted, so you order by weight for the compacted volume, not by loose yards.

Sources