How much concrete for 3 steps?

Short answer

Three solid steps 4 feet wide (7 inch rise, 11 inch run) with a 3 foot deep landing at the top take 33.8 cubic feet of concrete (1.25 cubic yards). With 10% extra that is 63 bags of 80 lb mix, or 83 of 60 lb. The three steps alone, without the landing, take 12.8 cubic feet: 24 bags of 80 lb.

How to work it out

  1. Step blocks: 4 ft × 11 in × 7 in × (1 + 2 + … + 3 = 6) + landing 36 in deep × 3 risers tall
  2. = 33.8 cu ft = 1.25 cu yd
  3. + 10% = 1.38 cu yd ÷ 0.6 cu ft per 80 lb bag = 63 bags

Three risers is the classic stoop up to a back door, about 21 inches of total rise. Where the steps lead to a door, a landing at the top is normally required — the International Residential Code calls for a landing or floor on each side of an exterior door (section R311.3), and your local code sets its size. That landing is most of the concrete.

Adjust for your project

Count the risers — the vertical faces — including the one up to the top landing or door
ft
in
Height of each step. Your local code sets the maximum
in
Front to back of each tread. Your local code sets the minimum
in
A landing is normally required at a door (IRC R311.3; your local code sets the size). 0 if the steps meet an existing porch or deck
Only this choice is added to your project’s Total to buy
Yield is printed on the bag; lb sizes are Quikrete figures, kg sizes Sakrete
More options: Extra
%
Formed steps: 5–10%
Bags of mix63 bags80 lb bag
Or ready-mix to order
1.38 cu yd (37.2 cu ft)
Concrete before the extra
1.25 cu yd (33.8 cu ft)
Total height
21 in
Total depth (front of bottom step to back of top)
69 in
Weight of the concrete (≈ 145 lb/cu ft)
4,906 lb (2 tons)
  • Total to buy counts this as ready-mix. Switch “How will you buy it?” to bags if you are mixing it yourself.
  • Steps attached to a house or porch may need footings below the frost line. Your building department will say.
Check your codeRiser height, tread depth, landing size and handrails are set by your local building code — check with your building department.

For this job · affiliate link
Portable electric concrete mixerSteps have to be filled in one go so the treads don’t separate. A drum mixer keeps up with a pour this size.
View on Amazon (opens in a new tab)

3 steps with a 3 ft landing at other widths (10% extra)

3 steps with a 3 ft landing at other widths (10% extra)
Step widthBags of mixOr ready-mix to orderWeight of the concrete (≈ 145 lb/cu ft)
3 ft47 bags1.03 cu yd3,679 lb
4 ft63 bags1.38 cu yd4,906 lb
5 ft78 bags1.72 cu yd6,132 lb
6 ft94 bags2.07 cu yd7,359 lb
8 ft125 bags2.76 cu yd9,812 lb

Where the concrete goes

The steps are a stack of blocks: the bottom one 4 ft wide, 33 in deep (three treads) and 7 in tall, the middle one 22 in deep, the top one 11 in deep — 12.8 cu ft in all. The landing sits behind the top step at the full 21 in height, so a 3 ft deep landing 4 ft wide adds 21 cu ft on its own, more than the three steps. Check the landing depth your code asks for and enter it; a deeper landing grows the order quickly.

Sixty-three 80 lb bags is about 1.4 cubic yards with the extra, and nearly 5,000 lb of concrete. That is a long day of mixing; many people order a small ready-mix load for a stoop with a landing, or fill the landing’s core with compacted gravel inside the forms if their plans allow it and subtract that volume. Fill the bottom step first and work up, giving the lower treads a few minutes to stiffen so the concrete doesn’t squeeze out under the riser boards.

Two, four or five steps

Each added step costs more than the last, and the landing grows with the total height. Without a landing, 2 steps take 12 bags, 3 take 24, 4 take 40 and 5 take 59 at this width and size. Check your riser and tread sizes against your local code before you build forms. The walk at the bottom is a small slab — how many bags of concrete for a 4×4 slab covers a typical one — and a curb or border alongside is on the curb calculator.

What you’ll need

As an Amazon Associate we earn from qualifying purchases. Links to products are affiliate links — they cost you nothing extra and help keep these calculators free.

Frequently asked questions

How much concrete for 3 steps without a landing?

0.48 cubic yards for three steps 4 feet wide, or 24 bags of 80 lb with 10% extra — only where the top step doesn’t serve a door.

How much concrete for 2 steps with a landing?

0.83 cubic yards with 10% extra, or 38 bags of 80 lb, with a 3 foot landing.

How much concrete for 4 steps with a landing?

2.01 cubic yards with 10% extra, or 91 bags of 80 lb. Ready-mix starts to make sense.